|
|
SUCCESS STORIES
- CASE STUDY-1- TIER 1 OPERATOR
- SINGLE PAGE PDF WITH DETAILS OF CASE STUDY-1
- CASE STUDY-2- INTERNATIONAL TIER 1 OPTICAL EQUIPMENT OEM TRAINING SUPPORT
- SINGLE PAGE PDF WITH DETAILS OF CASE STUDY-2
- CASE STUDY-3- PUNE METRO DATA CENTER AND SYSTEM INTEGRATION OF TELECOMMUNICATION SYSTEM
- TWO PAGE PDF WITH DETAILS OF CASE STUDY-3
- CASE STUDY-4- SAMRUDDHI MAHAMARG TUNNEL PROJECT ELV TELECOM PACKAGE OF INTEGRATED TUNNEL _SCOPE
- TWO PAGE PDF WITH DETAILS OF CASE STUDY-5
- CASE STUDY-5- CP-203R EASTERN DEDICATED FREIGHT CORRIDOR PROJECT
- THREE PAGE PDF WITH DETAILS OF CASE STUDY-5
- CASE STUDY-6-EASTERN DEDICATED FRIEGHT CORRIDOR (DURGAUTI - NEW KARWANDIA) BALANCE WORKS
- THREE PAGE PDF WITH DETAILS OF CASE STUDY-6 FROM PRESENTATION
- CASE STUDY-7-TELECOM PACKAGE FOR CONSTRUCTION OF SINGLEGAUGE SINGLE RAIL LINE FROM TEMA TO OKOSOMBO (GHANA)
- SINGLE PAGE PDF WITH DETAILS OF CASE STUDY-7
|
|
|
|
|